Chissonga FPSO and TLP to be tendered separately Maersk Oil and Gas A/S (Maersk) from Denmark, the national oil company Sonangol from Angola and Odebrecht from Brazil are proceeding to the selection of the contractors to be invited to bid on a floating, production, storage and offloading (FPSO) vessel and (more…)
Read moreLaverda to contain 100 million barrels deep offshore WA Woodside Petroleum (Woodside) from Australia and Mitsui Oil Exploration Co, Ltd (Mitsui) have decided to move ahead in the development of the Laverda oil field in respect with the promising conclusions of the last appraisal drilling operations. In Laverda the both (more…)
Read moreTags: Aker Solutions, appraisal wells, Australia, barrels of oil equivalent (BOE), capital expenditure, conceptual design, conceptual study, Cossak-Wanaea, crude oil, Enfield, Engineering Procurement and Construction, Exmouth Sub-Basin, Exploration & Production, ExxonMobil, FEED, Floatec, Front End Engineering and Design (FEED), Greater Laverda oil field, IntecSea Engineering, joint venture, Laminaria-Coralina, Laverda appraisal drilling, Laverda Appraisal program, Laverda appraisal wells, Laverda conceptual design contest, Laverda deep offshore oil field., Laverda deep water offshore project, Laverda East-1, Laverda FPSO, Laverda North-1, Laverda North-2, Laverda project pre-study, Laverda Western Australia, Mitsui Laverda, MODEC, offshore, Offshore North West Cape, Offshore technology, ogp projects, OGP projects pursuit, Oil & Gas, Oil & Gas and Petrochemical, Oil & Gas and Petrochemical capital expenditures, Oil & Gas and Petrochemical Contract, Oil & Gas and Petrochemical Project, oil and gas, Oil news, Oil&Gas, Production Storage and Offloading vessel (FPSO)., Project Feasibility study, recoverable reserves, Robert Edwardes, SBM Offshore, Semi-submersible, Semi-submersible production platform, Semisubmersible, single point anchor reservoir (SPAR), Single Point of Anchor Reservoir (SPAR), Technip, Tension Leg Platform (TLP), upstream, Vincent fields, Wison Offshore, Woodside block WA36-R, Woodside Laverda, Woodside Laverda operator
Posted in One day - One News | Leave a comment
Posted in One day - One News | Leave a comment
A good option for ExxonMobil/BHP and Woodside ExxonMobil‘s affiliate Esso Australia Resources Pty Ltd is the operator of the Scarborough gas field, a 50/50 joint venture with BHP Billiton. The Scarborough field is one of the most remote of the Carnarvon Basin gas resources and the development remains challenging due (more…)
Read moreTags: Ashburton North, Australia, BHP, BHP Billington, Burrup Peninsula, Call for Tender, capital expenditure, Carnarvon Basin, completion, deep water, Esso, Esso Australia Resources Pty Ltd, ExxonMobil, FEED, fLNG, Floatec, floating LNG, front end engineering and design, gas, hull, Invitations To Bid (ITB), ITB definition, JP Kenny, LNG Terminal, LNG trading, LNG Trains, Mustang Engineering, offshore, offshore platform, Offshore technology, ogp projects, OGP projects pursuit, Oil & Gas, Oil & Gas and Petrochemical, Oil & Gas and Petrochemical capital expenditures, Oil & Gas and Petrochemical Project, Oil news, Oil&Gas, Pilbara LNG, Pilbara LNG project, Pluto LNG project, pre-FEED, Project Feasibility study, Scarborough, Scarborough gas field, Scarborough LNG, sub-sea, sub-sea well, subsea, topsides, upstream, WA, Western Australia, Wheatstone LNG, Wheatstone LNG project, Woodside, Woodside Petroleum
Posted in One day - One Project | Leave a comment
Posted in One day - One Project | Leave a comment
Recent Comments