CNOOC to tender one FEED for two TLPs in Liuhua The national oil company (NOC) China National Offshore Oil Corporation (CNOOC) made its mind up regarding the conceptual design to be used for the development of the offshore oil and gas fields Liuhua 11-1 and Liuhua 16-2 in favor two […]
Read more
Tags:
Call for Tender,
Chemical injection process,
conceptual design,
conceptual study,
Conventional semi-submersible platforms,
crude oil Liuhua,
DMAR Engineering Houston Texas USA,
electrical submersible pumps ESPs,
engineering procurement and construction EPC,
ESPs power supply and operation,
feasibility study,
FEED contract for the Liuhua 11-1 and Liuhua 16-2 TLPs,
Front End Engineering and Design (FEED),
heavy crude oil,
Liuhua FPSO,
Liuhua southeast of Hong Kong,
London-based major company BP,
Nanhai Shengli floating production storage and offloading FPSO,
Nanhai Shengli vessel,
national oil company NOC China National Offshore Oil Corporation CNOOC,
offshore field in production in China,
offshore oil and gas fields Liuhua 11-1 and Liuhua 16-2,
oil and gas production,
Power generation,
power link,
pre-front end engineering and design (pre-FEED),
South China Sea,
subsea electrical cable,
tension legs platforms TLPs,
TLP on Liuhua 11-1,
TLP on Liuhua 16-2,
TLPs architecture,
topsides,
Umbilicals,
wellhead slots Posted in
One day - One Project |
Leave a comment
Recent Comments