Statoil and Sinochem add new platform in Peregrino II The state-owned companies Statoil from Norway and Sinochem from China, partnering in the offshore Peregrino field, submitted the plan of development (POD) for its southwest expansion in the Campos Basin to Brazil National agency of Petroleum, Natural Gas and Biofuel (ANP). […]
Read more
Tags:
$3.5 billion capital expenditure Peregrino Phase-2,
API heavy crude oil,
Blocks BM-C-7 and BM-C-47,
Campos Basin offshore Brazil,
Campos Basin to Brazil National agency of Petroleum Natural Gas and Biofuel ANP,
drilling and wellhead platforms A and B,
enhanced oil recovery (EOR) techniques,
EOR,
FEED,
floating storage production and offloading FPSO vessel,
flow assurance and water injection,
foreign companies for exploration and production,
FPSO,
front end engineering and design (FEED) work,
heavy crude oil,
horizontal wells,
offshore Peregrino field,
Peregrino Phase-1,
Peregrino Phase-2 project,
Peregrino Platform-C,
Peregrino post-salt oil and gas fields,
plan of development (POD),
pre-front end engineering and design (pre-FEED),
production wells,
recoverable reserves,
recoverable resources of oil.,
Southwest wellhead platform WHP-C,
standalone power generation,
Statoil from Norway and Sinochem from China,
Statoil largest heavy crude oil field Peregrino,
Statoil operator,
water injection wells,
wells Posted in
One day - One News,
One day - One Project |
1 Comment
Recent Comments